page-template,page-template-full_width,page-template-full_width-php,page,page-id-348,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-16.8,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.5.2,vc_responsive
 

Background

COMPANY STRUCTURE

BOARD OF DIRECTOR

Choo Tai Wei

Lee Yuan Xing

Leong Hong Lin

David Wong

DIRECTORS & MEMBERS

LMX TEAM

Lee Yuan Xing

Mr. Lee Yuan Xing, a Malaysian male, age 41, he have vast experience in structural, piping work back ground. Operating the manufacturer and CNC machining workshop in Mount Austin Johor. He responsible for business and construction works related structural & piping works. Currently is assigned in Pengerang Rapid Pkg 4, Pkg 12B, Pkg 14 & Pkg 36 works.

Leong Hong Lin

Mr Leong was appointed as Company General Manager with exposure experience of 30years in oil & gas division. Early day of career were with EXXONMOBIL Production Malaysia Inc. at Offshore maintenance,design and construction, Shipyard oil & gas platform fabrication, installation, hook up & commissioning. Working experience in Malaysia, Thailand, Sudan, Middle East Saudi Arabia with onshore plant, offshore hook up, retrofit and revamp works. Currently is managing a group of 150 mans at site in Rapid Pkg 36 works

David Wong

Mr Wong was appointed as Technical Director in the company. He has more than 21 years in design engineering, project management, construction, commissioning & turnaround works in heavy industry, offshore production platform, onshore receiving terminal, FPSO, Complex Petrochemical Plant, Refinery and Petrochemical Integrated Development. Currently, He responsible for high voltage substation Gas Insulated Switchgear (GIS), Air Insulated Switchgear (AIS), distribution power transformer, electrical network monitoring and control system commissioning works at site in Rapid Pkg 12.

Mohd Taufik Bin Ali

He was appointed as Construction Superintendent overall incharge is architectural, electrical & instrumentation site works 25 years’ experience in architectural wall paneling and fire door works.

Summary of Our Company Financial Capabilities

Our company currently undertaking 1 Rapid project – Pkg 36 with contract value4 million.

We had completed Pkg 4 Architectural works for 5 building worth 1 million works

We had completed Pkg 12B on the Electrical & Instrumentation workswith contract RM 1.4 million

We had completed piping installation work for Pkg 14 safety water eyewash station contract RM 200,000.

We can provide 1 stop solution for design, supply, install andcommissioning works for many oil & gas, chemical plant turnkey work.